How a Winchmore Hill Project Runs
Renovating a house is a big undertaking, so we follow the same clear sequence on every project, with regular updates at each stage:
Initial visit: We discuss what you want to achieve, your budget and your timescale, and look at the house.
Design and planning: Our architect prepares measured plans, elevations and technical drawings, and we submit any planning, prior approval or Lawful Development Certificate application to Enfield Council.
Quotation and contract: You receive a detailed, itemised quotation, and the contract sets out the scope, programme and payment stages.
Construction: Your project manager runs the site day to day and keeps you updated. We protect your home, keep the site clean and safe, and keep disruption to a minimum.
Handover: We inspect every room with you, issue the certificates and hand over the finished house.
FAQs
Winchmore Hill House Renovation: Your Questions
Do I need planning permission for a house extension in Winchmore Hill?
In many cases, no. Under permitted development, a one-storey addition at the back may reach 3 metres on a semi or terrace and 4 metres on a detached home; Enfield Council’s prior approval route takes those figures to 6 and 8 metres. You will need a full application for a side addition wider than half the original house, for anything two storeys high, and for most projects inside a conservation area. We draw and lodge it for you.
Is my Winchmore Hill house in a conservation area?
It may be. Enfield Council has 22 conservation areas, and those in and around N21 include Winchmore Hill Green, Grange Park and Vicars Moor Lane. Inside them, permitted development rights are reduced, so loft dormers, side extensions and some external changes need planning permission. On our first visit we look your street up on Enfield’s conservation area map.
Can I convert my loft without planning permission?
For most semis and detached houses that sit outside a conservation area, it can be. Permitted development allows 50 cubic metres of new roof space (40 on a terrace), as long as the roof keeps its existing ridge height and any dormer faces the rear. Before building, we normally advise applying to Enfield Council for a Lawful Development Certificate as written confirmation.
How long does a house extension take to build?
A single-storey rear extension usually takes around three months on site, and a loft conversion around two to three months. Design, planning or prior approval and Building Regulations approval come first and typically take two to four months, depending on the application.
Do you deal with Building Regulations and party wall notices?
Yes. We prepare the Building Regulations drawings and structural calculations and arrange inspections. We also prepare and serve the party wall notices, and arrange the party wall process with your neighbours on your behalf.
Can you renovate the rest of the house at the same time?
Yes, and it is often the most efficient way to work. While an extension or loft is being built, our own trades can rewire, replace the heating, fit a new kitchen and bathrooms and redecorate, so the whole house is finished together.