main_images
Refurbished flat in Tottenham

Built Around What the Building Allows

In a flat, the lease, the freeholder and the neighbours shape the job as much as the design does.

Tottenham has a wide mix of flats: former council blocks from the 1960s to the 1980s, Victorian houses divided into two or three homes, flats above the shops on the High Road, and newer developments around Tottenham Hale. Each comes with different rules about what can be changed and who needs to agree.

At London Renovation Company, our own builders, plumbers, electricians, Gas Safe engineers and decorators carry out the work, and we prepare the information your freeholder, Building Control or Haringey Council needs. Everything from cabinets to sanitaryware is bought at trade rates and itemised.

Arrange a Flat Survey in Tottenham

Contact Information

Let us know which kind of flat you own and the changes you have in mind. After a visit and a look at the lease, you receive a price broken down by trade.

    Three Kinds of Tottenham Flat, Three Different Jobs

    Ex-council block in Tottenham
    Victorian house converted into flats

    An ex-council flat, a period conversion and a new-build flat can need very similar work inside, but the permissions, the building fabric and the risks differ. Knowing which one you have decides the order of the job.

    Victorian house converted into flats

    A flat refurbishment with us can include:

    • Rewiring with NICEIC certification and a new consumer unit
    • A new combi boiler and radiators fitted by our Gas Safe engineers
    • Kitchens and bathrooms at trade cost, or installed from a supplier you choose
    • Plastering, flooring, joinery and decoration throughout

    We work across N17, from Bruce Grove and Tottenham Green to White Hart Lane and Tottenham Hale.

    Ex-Council Flats Bought Under Right to Buy

    Many Tottenham flats were bought from the council and are now owner-occupied or let. They are usually solidly built, but kitchens, bathrooms, wiring and heating are often original or decades old.

    Landlord Permission From Haringey

    Where Haringey Council remains the freeholder, most leases need its written permission for alterations such as moving walls, kitchens or bathrooms. We provide the drawings and method details with the request.

    Asbestos Checks Before Work Starts

    Blocks built before 2000 may contain asbestos in textured ceilings, floor tiles or pipe boxing. Before we disturb any of these, a refurbishment survey identifies what is there so it can be removed or left safely in place.

    Kitchen refit in an ex-council flat
    Flat above a shop on Tottenham High Road

    Period Conversions and Homes Over High Road Shopfronts

    Victorian and Edwardian houses split into flats, and flats above the shops on Tottenham High Road, often share old timber floors and stairs with their neighbours. Many on the High Road also sit in one of its conservation areas, where external changes need planning permission. Renovating a whole house? Visit house renovation in Tottenham.

    Separating Each Home From the Next

    Acoustic upgrades to the floors, fire-rated doors where required and a check on the fire barrier above any shop make each home quieter and safer.

    Small-Flat Layouts That Work Harder

    Most N17 flats are compact, so the layout matters as much as the finishes.

    Kitchen-Living Rooms

    Opening the kitchen into the living room, where the structure and lease allow, for one brighter space.

    Storage Built Into Every Recess

    Fitted cupboards in alcoves, over doors and under the stairs to keep small rooms clear.

    Less Noise From Upstairs

    Acoustic layers in floors and ceilings, and sealed gaps around pipes and lights.

    Kitchens and bathrooms are covered in more detail on kitchen renovation in Tottenham and bathroom renovation in Tottenham.

    Five Stages of a Tottenham Flat Refurbishment

    Each flat follows the same five stages:


    01.

    Lease Check and Survey

    We look at the flat and your lease to see what needs permission.

    02.

    Consents and Asbestos Survey

    Freeholder and Building Control approvals, plus an asbestos survey for older blocks.

    03.

    Strip-Out and First Fix

    Old fittings out, then new wiring, pipework and heating in place.

    04.

    Fitting Out the Rooms

    Kitchen, bathroom, plastering, flooring and decoration.

    05.

    Certificates and Handover

    Final checks and the electrical, gas and Building Control paperwork.

    Rewiring a flat Finished living room in N17

    What decides the cost: how much rewiring and pipework the flat needs, whether walls move, the kitchen and bathroom you choose, and any asbestos found.

    Flats for Owners, Landlords and First-Time Buyers

    Who the flat is for changes the priorities.

    Owner-Occupier Upgrades

    Layout changes, better storage and finishes chosen to last.

    Rental Flats Ready for the Next Let

    Quick, durable refits with fresh electrical and gas certificates.

    New-Build Upgrades at Tottenham Hale

    Kitchen, bathroom and storage improvements in newer flats, within the building’s rules.

    Nearby Flats and Whole-House Work

    Flat refurbishment in North London

    Flats

    Flat Renovation Near N17

    Flat work in neighbouring areas: Wood Green, Stoke Newington and Seven Sisters.

    Architect’s drawings for a flat extension

    Design

    Extensions and Roof Rooms

    Extending a garden or top-floor flat always needs planning permission; our architect in Tottenham can advise.

    Flat Renovation Tottenham: Questions Owners Ask

    Usually, yes, for anything beyond decoration. If you bought under Right to Buy, Haringey Council normally remains the freeholder, and most council leases require its written permission before you move walls, relocate a kitchen or bathroom, or change windows. We prepare the drawings and description of works the council asks for.

    If the block was built before 2000, it may contain asbestos in places such as ceiling coatings, floor tiles or boxing around pipes. The freeholder manages it in the shared parts, and before we disturb walls, ceilings or floors inside your flat we arrange a refurbishment survey so anything found is dealt with safely first.

    Mostly it needs extra planning. We confirm the floor below gives proper fire separation from the shop and that the way out is protected, improve soundproofing where it falls short, and time deliveries and the loudest jobs around opening hours.

    For a one- or two-bedroom flat with new wiring, heating, kitchen and bathroom, allow roughly two to three months on site. A lighter refresh between lets, mostly decoration and floors, can be done in two or three weeks. Getting consents can add time at the start, so we build that into the plan.

    A new combi boiler is the usual choice and our Gas Safe engineers fit and certify it. An air-source heat pump can work in some flats, particularly ground-floor flats with outdoor space, but the outdoor unit needs a suitable position and often freeholder and planning approval, so we check before recommending it.

    Yes. We refurbish rental flats to a fixed finish date so they can be re-let quickly, using hard-wearing finishes, and issue the electrical and gas certificates landlords need. Agents can arrange access with us directly.