We are London Renovation Company. Most flats around Finsbury Park sit inside converted Victorian houses or in purpose-built blocks, so each one is shaped by its lease, its freeholder and the people living above or below. We plan your renovation around all three, so the work is approved, insured and agreed before the first wall is opened.
Below are a few of our completed projects across London. Each was designed, built and certified by our own team.
Finsbury Park
What does a flat renovation in Finsbury Park involve?
It usually means bringing an older flat up to date from the inside: a new kitchen and bathroom, rewiring, new heating, better sound and heat insulation, and floors, plaster and decoration throughout. In a converted house, it often also means sorting out a layout that was squeezed into rooms never designed as a separate home.
London Renovation Company carries out the whole job with its own trades: builders, plumbers, Gas Safe registered engineers, NICEIC approved electricians, plasterers, tilers and decorators. One project lead runs your flat from the first visit to handover.
Property Types
Which flats around the park need the most work?
Flats carved out of Victorian terraces are the most common, and they tend to need the most. Typical issues include a bathroom tucked into a former landing, a kitchen in what was a bedroom, wiring and pipework from several different decades, and floors that carry sound straight through to the flat below.
Flats in purpose-built blocks are usually more regular, but the building sets firmer rules: managing agents, fixed service risers and shared fire protection. Top-floor and garden flats each bring their own questions, from roof access to who owns the outside space.
Your Lease
What does your freeholder need to approve?
Most leases allow decoration without asking, but anything that touches the structure, the floors, the plumbing or the wiring needs written consent. Starting without it can put you in breach of your lease, so we treat consent as the first job, not the last.
Licence for Alterations
We produce the drawings, specification and method statement your freeholder or their surveyor will ask to see, and answer their questions. Once the licence is granted, we follow its conditions on site and keep a record you can show them at the end.
Managing Agents and Working Hours
Where a managing agent looks after the building, we agree the working hours, how deliveries and waste will move through shared areas, and how hallways and stairs will be protected. Some buildings set shorter hours than the council allows, and we work to whichever is tighter.
Councils
Which council covers your flat: Islington, Haringey or Hackney?
Finsbury Park is split between three councils. The park belongs to Haringey, Hackney begins across part of Seven Sisters Road, and Islington takes in the streets on the far side of Stroud Green Road and Blackstock Road. Which council covers your flat decides who handles any planning question and who inspects the work.
Conservation Areas
Haringey’s Stroud Green Conservation Area (designated 2003), Islington’s own Stroud Green Conservation Area (2006) and Islington’s Tollington Park Conservation Area (1989) all lie close to the park. Flats carry none of the permitted development rights that houses enjoy, so alterations to windows, doors or anything else on the outside of the building generally need planning permission, and in a conservation area the council will look closely at the detail.
Building Control Sign-Off
New electrical circuits, a new boiler, structural changes and new drainage all come under Building Regulations. We arrange the inspections with the right council or an approved inspector and collect the certificates for you.
Neighbours
How do we handle sound, fire doors and party walls between flats?
Living above, below and beside other people means three things need care.
- Sound: when floors come up, we add acoustic insulation and, where your lease requires it, a sound-reducing layer under hard flooring.
- Fire doors: in a block or a converted house with a shared stair, your front door is part of the escape route. A new one has to carry fire-door certification, and nothing we change inside may block the way out.
- Party walls: the Party Wall Act can apply to the floors and walls you share with another flat. We serve the notices and, on work we are carrying out ourselves, can act as party wall surveyor.
Cost
What sets the cost of a flat refurbishment?
We price every flat from a free survey, with a fixed quote broken down line by line. These are the things that move the number most:
- Moving the kitchen or bathroom, because the waste must still reach the shared soil stack
- The state of the existing wiring, pipework and floors, which an older conversion often hides
- Access: stairs with no lift, narrow hallways and where a skip or van can legally stop
- Freeholder costs, such as their surveyor’s fee for the licence for alterations
- Your choice of kitchen, bathroom and finishes, all supplied at trade price
Process
How does the work run from survey to handover?
First, we visit, go through the parts of your lease that matter, look over the building and send a fixed quote. Next, we prepare the paperwork for your freeholder and any council approvals, and agree arrangements with the managing agent. Then our trades complete the flat, any required inspections take place, and the certificates come to you with the keys.
We also renovate flats nearby in Highbury, Holloway, Archway, Crouch End, Stoke Newington and across Islington, as well as Tufnell Park and the rest of North London. For whole houses or single rooms in the area, see our house renovation, kitchen renovation and bathroom renovation pages for Finsbury Park.
Flat Renovation Questions
Usually, for anything beyond decoration. Most leases ask for written consent before walls, floors, plumbing or wiring are changed. Our team draws up what the freeholder asks to see, and work only begins once that consent has been given in writing.
That comes down to the street. Three councils share the area, so we look up your address on the councils’ maps before anything is drawn and work with that council’s planning and Building Control teams.
Check your lease first. Many leases for upper-floor flats limit hard flooring or require an acoustic layer beneath it, to protect the flat below. We read the clause with you and fit the floor build-up it asks for.
Often, but the waste pipes have to reach the building’s shared soil stack with a steady fall, and the freeholder must agree. That route is the first thing we look at when we visit.
Some noise is unavoidable, so we agree working hours with the managing agent, keep shared hallways protected and clean, and give neighbours notice before the noisiest days.
Electrical certification from our NICEIC approved team, a Gas Safe record for anything involving gas, Building Control sign-off where needed, and evidence for your freeholder that the licence conditions were met.