New family bathroom in a Whetstone semi-detached house

Family bathrooms, en-suites and flat bathrooms in N20, designed, plumbed, tiled and certified by one team.

Have Your Bathroom Measured and Priced

Contact Information

We visit, measure the room, check the waste route and water pressure, and send an itemised price for the suite, tiling and every trade.

    Bathroom Fitters Whetstone, From Pipework to Grout

    Measuring a bathroom
    Tiler at work in N20

    Most Whetstone bathrooms were built for the 1930s: a small room at the top of the stairs, often with the toilet in a separate cubicle beside it. Bringing them up to date means rethinking the layout as well as the fittings, which is where design and installation by the same people pays off.

    Tiler at work in N20

    At London Renovation Company, our plumbers, tilers, carpenters and electricians handle the whole bathroom, with electrical work certified under NICEIC and gas work under Gas Safe. Suites, tiles and brassware are passed on at trade price.

    Three Reasons Owners Choose a Single Team

    1. One price: strip-out, plumbing, electrics, tiling and decorating itemised together.

    2. No waiting between trades: each stage follows straight on from the last.

    3. One set of certificates: electrical, gas and Building Control paperwork handed over at the end.

    Merging a Small Bathroom With the Next-Door Loo

    Taking down the thin wall between a 1930s bathroom and its separate toilet often gives enough space for a full-size shower beside the bath, or a walk-in shower and a double basin. The toilet usually stays on the same soil pipe, which keeps the drainage simple. If you prefer to keep a separate toilet for a busy household, we can refit both rooms instead.

    Bath and shower together

    Bath and shower together

    Walk-in shower

    Walk-in shower

    Double basin unit

    Double basin unit

    Five Steps From Old Suite to Finished Room


    01.

    Phase 1: Measuring Up and Checking the Waste Run

    Room measured, water pressure tested and the route to the soil pipe checked.

    02.

    Phase 2: Agreed Layout With Every Item Priced

    A scaled layout and a price listing the suite, tiles and each trade.

    03.

    Phase 3: Clearing the Room and Running New Services

    Old suite and tiles removed, then new pipework, wiring and extraction installed.

    04.

    Phase 4: Waterproof Membrane, Then Tiles

    Shower and bath areas tanked before the walls and floor are tiled.

    05.

    Phase 5: Commissioning, Testing and Your Certificates

    Suite connected and tested, fan and electrics certified, and the room handed back clean.

    Finished bathroom in Whetstone

    En-Suites Tucked Into Loft Conversions

    A hip-to-gable or dormer loft on a Whetstone semi usually has room for a shower en-suite, sited under the tallest part of the new roof and stacked over the existing bathroom so the pipes stay short. A mechanical fan and, where needed, a small pump are designed in from the start. For the loft itself, see house renovation in Whetstone and our architect in Whetstone.

    Loft en-suite shower
    Dormer bathroom
    Rooflight over a shower

    When the Bathroom Sits Over Another Flat’s Bedroom

    In N20 flats, a bathroom refit has to protect the home below. We tank every wet area, pressure-test each joint, add access panels to traps and valves, and check the lease for the freeholder’s consent and any rules on floor finishes. More on flats: flat renovation in Whetstone. Kitchens: kitchen refurbishment in Whetstone.

    Bathrooms nearby: North Finchley, Finchley and Southgate.

    Whetstone Bathroom Refits: Straight Answers

    Usually, yes. Moving a toilet or adding a new one means a new connection to the soil pipe or drain, which is building work under Part H of the Building Regulations and is normally notified to Building Control. The waste pipe also needs enough fall, so we check the route on the first visit before agreeing a new layout.

    A new bathroom, such as a loft en-suite or a bathroom moved to another room, must have mechanical extract ventilation to Approved Document F, which sets 15 litres per second for an intermittent bathroom fan. When we refit an existing bathroom we fit a fan to the same standard, ducted to the outside, because poor ventilation is the main cause of mould in N20 bathrooms.

    For a straight refit of a family bathroom in a semi, there are usually around ten working days without a usable bath or shower, with the toilet reconnected each evening where possible. In houses with a second WC or an en-suite, the disruption is much smaller. We give you the exact days before work starts.

    In a small bathroom it often is. A thin heating mat under the tiles keeps the floor warm, dries the room faster and frees wall space taken up by a radiator. Because it is new electrical work in a bathroom, it is notifiable, and our NICEIC-registered electricians install, test and certify it.