    Crouch End’s houses were built with small bathrooms, or none at all, and most have been altered several times since. A bathroom renovation in Crouch End is a chance to put that right: a layout that suits the family, fittings that suit the house, and plumbing, floors and ventilation that will last. Book a free survey or ask us for a fixed quote.

    Bathroom fitters tiling a shower wall in N8

    Crouch End

    Bathroom Fitters in Crouch End From One In-House Team

    Employed tradespeople – our plumbers, tilers, joiners, plasterers, electricians and painters do the work.

    Four accreditations – NICEIC Approved Contractor, FMB member, Gas Safe registered and TrustMark registered through NAPIT.

    Design and layout – drawn up before any old tiles come off, so the plan and the price are clear.

    Trade-price sanitaryware – baths, basins, taps, tiles and fittings passed on at our cost.

    One fixed quotation – itemised, with a programme for the work.

    Cast-iron roll-top bath in a Victorian bathroom

    Roll-Top Baths and Heavy Fittings on Old Floors

    A freestanding cast-iron or stone-resin bath is the centrepiece many owners want in a Victorian or Edwardian house. Filled, it can weigh several hundred kilograms on four small feet, and the joists beneath are often more than a century old, notched by generations of plumbers.

    Before it goes in, we lift boards to check joist size, span and condition, then sister or strengthen joists, or fit a spreader plate, where needed. The same applies to stone basins, large-format tiles and solid worktops: weight is planned for, not discovered.

    Period Character: Tiles, Panelling and Traditional Sanitaryware

    A bathroom in a period house does not have to be a reproduction, but it should belong to the building. Popular choices in Crouch End include:

    • Metro and encaustic-pattern tiles, laid to sensible set-outs
    • Painted tongue-and-groove or panelled walls, sealed for wet areas
    • High- or low-level cistern toilets, washstands and cross-head taps
    • Restored sash windows with frosted or etched glass for privacy

    Where you prefer something modern, we keep original cornices, ceiling roses and doors so the room still reads as part of the house.

    Encaustic-pattern floor tiles and panelled bathroom wall
    Loft ensuite shower under a sloping ceiling in Crouch End

    Loft Bathrooms and Top-Floor Ensuites

    Adding a second bathroom is one of the most valuable changes in a family house. The loft or top floor is the usual place, and the deciding factors are practical:

    Waste route – new waste pipes need a steady fall all the way to the main drain stack.

    Headroom – showers and toilets placed where the roof is highest; baths can sit under the slope.

    Water pressure – showers at the top of the house can be weak without a pumped or mains-pressure system.

    When the ensuite is part of a loft conversion, we design it with the structure from the start. Loft conversions are covered under house renovation in Crouch End.

    Bathrooms in Crouch End Flats

    In a converted flat, the bathroom sits above a neighbour’s ceiling. We tank the floor and walls, test every joint, and keep the toilet close to the shared soil stack. If the lease requires the freeholder’s consent for plumbing or layout changes, we prepare the drawings for the application. Leases and consents are explained under flat renovation in Crouch End.

    Shower room in a converted flat in N8
    Heated towel rail and extractor in a Crouch End bathroom

    Water Pressure, Heating and Ventilation in Older Houses

    Pressure and hot water

    Many Crouch End houses still have a cold-water tank in the loft feeding a weak shower. We test the incoming supply and pick the right hot-water set-up (combi, shower pump or mains-pressure cylinder), installed by our Gas Safe engineers.

    Heating

    Underfloor heating under tiles, or a heated towel rail on the central heating, keeps the room warm and dry.

    Ventilation

    Steam trapped in a solid-walled house leads to mould and peeling paint. An extractor ducted outside, with a humidity sensor, solves it; in the conservation area we route ducts away from the front of the house where possible.

    From Survey to Finished Bathroom

    1. Survey and design

    We measure the room, check joists, pipes and pressure, and draw the layout with you.

    2. Strip-out and first fix

    The old bathroom comes out, any floor or pipe repairs are made, and new plumbing, wiring and ducting go in.

    3. Waterproofing, tiling and fitting

    Walls and floors are tanked, tiled and fitted with the suite, then signed off with electrical certification.

    Bathroom being tanked before tiling
    Finished bathroom renovation in Crouch End

    Plan Your Crouch End Bathroom With Us

    Send us a few photos of the room and tell us the bathroom you have in mind. We will arrange a free visit and follow up with a fixed price and a programme.

    Planning a new kitchen as well? Visit kitchen renovation in Crouch End, and for design across the whole house, our architect in Crouch End. Neighbouring bathroom pages: Archway, Hornsey, Finsbury Park and Highgate.

    London Renovation Company · 020 8050 4086 · londonrenovationcompany@gmail.com · Contact us

    Bathroom Renovation Crouch End: Common Questions

    Often, but it should be checked first. A cast-iron bath filled with water and a bather can weigh several hundred kilograms, resting on four small feet. We lift boards to check the joists’ size, span and condition, and add strengthening or a spreader plate where needed before the bath goes in.

    Replacing a suite in the same place usually does not, but creating a bathroom where there was none does, covering drainage, ventilation and structure. Electrical work near a bath or shower is notifiable either way; our NICEIC registration lets us certify it.

    In most houses, yes, provided the new waste pipes can fall to the main drain stack and there is standing height for the shower. When it forms part of a loft conversion, the pipe route and water supply are planned alongside the structure from day one.

    A straight refit of an existing bathroom typically takes two to three weeks once materials are on site. Moving the toilet, adding a wet room or building a new ensuite takes longer, and we give you a programme with the quote.